There is regular maintenance on the Hubertus tunnel. To hinder the traffic as little as possible, work is planned in the evening and at night if this is possible. The following closures are planned for 2019:

3 to 5 September (from 9 p.m. to (maximum) 5 p.m.)

9 on 10 September 2019

10 on September 11, 2019

9 on December 10, 2019 10 on December 11, 2019

The closures are always from 9 p.m. to (maximum) 6 a.m. unless otherwise stated.

See further the the source of the message.